News 2009-2010
- May 2010: First time joint profiles F40 are built in between track support slabs system ÖBB-Porr for final railway construction of Lainzer Tunnels in Austria.
- February 2010: Lecture Dr. Grabe at the Quality community traffic areas out of concrete, „Joints in concrete pavements the new ZTV Fug is adopted to the European standards“
- In 2009 WGD client ES begin the regular production of 290 mm wide couplings seals for HOBAS
- In 2009 a total of 270.00 m filler profiles F6 and F8 have been installed